Publications

To be updated

International Journal Articles

  • Woo-Lahm Kwak and Soo Y. Chang, “Order consolidation for hierarchical product lines”, Journal of Combinatorial Optimization, DOI: 10.1007/s10878-012-9538-z, Springer (2012). 
  • Kyungkuk Lim, Kangbok Lee and Soo Y. Chang, “Improved bounds for online scheduling with eligibility
    constraints”, Theoretical Computer Science, Vol.412, 5211-5224, Elsevier (2011). 
  • Junho Chang, Soo Y. Chang, Sung-Pil Hong, Yun-Hong Min and Myoung-Ju Park, “Approximation of a Batch Consolidation Problem”, Networks, DOI: 10.1002/net.20409 (2010). 
  • Byung-In Kim, Soo Y. ChangJunho ChangYoontech Han, Jeongin Koo, Kyungkuk Lim, Jaejoon Shin, Sangwon Jeong and Woolahm Kwak, “Scheduling of raw-material unloading from ships at a steelworks”, Production Planning & Control, Vol.22, pp. 389-402, Taylor & Francis (2010). 
  • Sung-Pil Hong, Myoung-Ju Park and Soo Y. Chang, “Approximation of k-batch consolidation problem”, Theoretical Computer Science, Vol.410, pp.963-967, Elsevier (2009). 
  • Patrick N. Bless, Diego Klabjan and Soo Y. Chang, “Heuristics for automated knowledge source integration and service composition”, Computers & Operation Research, Vol.35, pp.1292-1314, Elsevier (2008). 
  • Taebok Kim, Yushin Hong and Soo Young Chang, “Joint Economic Production-Shipment Policy in a Single-Manufacturer-Multiple-Item System”, International Journal of Industrial EngineeringVol.13, pp.357-363, Elsevier (2006). 
  • Jongho Park , Soo Y. Chang and Kangbok Lee, “Online and semi-online scheduling of two machines under a grade of service provision”, Operations Research Letters, Vol.34, pp.692-696, Elsevier (2006). 
  • Taebok Kim, Yushin Hong and Soo Young Chang, “Joint economic procurement-production-delivery policy for multiple items in a single-manufacturer, multiple-retailer system”, International Journal of Production Economics, Vol.103, pp.199-208, Elsevier (2006). 
  • Won-young Shin, Soo Y. Chang, Jaewook Lee and Chi-Hyuck Jun, “Frequency Insertion Strategy for Channel Assignment Problem”, Wireless Networks, Vol.12, pp.45-52, Springer (2006). 
  • Soo Y. Chang, Hark-Chin Hwang and Sanghyuck Park, “A two-dimensional vector packing model for the efficient use of coil cassettes”, Computers and Operations Research, Vol.32, pp.2051-2058, Elsevier (2005). 
  • In-Jun Jeong, Kwang-Jae Kim and Soo Y. Chang , “Optimal Weighting of Bias and Variance in Dual Response Surface Optimization”, Journal of Quality Technology, Vol.37, pp.236-247 (2005). 
  • Soo Y. Chang, Hark-Chin Hwang and Jongho Park, “Semi-on-Line Parallel Machines Scheduling under Known Total and Largest Processing Times”, Journal of the Operations Research Society of Japan, Vol.48, pp.1-8 (2005). 
  • Hark-Chin Hwang, Kangbok Lee and Soo Y. Chang, “The effect of machine availability on the worst-case performance of LPT”, Discrete Applied Mathematics, Vol.148, pp.49-61, Elsevier Science B.V. (2005). 
  • Hark-Chin Hwang and Soo Y. Chang, “Order consolidation for batch processing”, Journal of Combinatorial Optimization, Vol. 9, pp.121-138, Springer (2005). 
  • Hark-Chin Hwang, Soo Y. Chang and Kangbok Lee, “Parallel machine scheduling under a Grade of Service provision”, Computers and Operations Research, Vol.31, pp.2055-2061, Elsevier (2004). 
  • Kangbok LeeSoo Y. Chang and Yushin Hong, “Continuous slab caster scheduling and interval graphs”, Production Planning and Control, Vol.15, pp.495-501, Taylor & Francis (2004). 
  • Hark-Chin Hwang, Soo Y. Chang and Yushin Hong, “A Posterior Competitiveness for List Scheduling Algorithm on Machines with Eligibility Constraints”, Asia-Pacific Journal of Operational Research, Vol.21, pp.117-125 (2004). 
  • Hyungwoo Park , Yushin Hong and Soo Young Chang, “An efficient scheduling algorithm for the hot coil making in the steel mini-mill”, Production Planning and Control, Vol.13, pp.298-306, Taylor & Francis (2002). 
  • C. H. Kim and Y. Hong and Soo Y. Chang, “Optimal Production Run Length and Inspection Schedules in A Deteriorating Production Process”, IIE Transactions, Vol.33, pp.421-426, Kluwer Academic Publishers (2001). 
  • D. Seong, S. Y. Chang and Y. Hong , “An Algorithm for Buffer Allocation with Linear Resource Constraints in a Continuous Flow Production”, Asia-Pacific Journal of Operational Research, Vol.17, pp.169-180 (2000). 
  • Soo Y. ChangMyong-Rae Chang and Yushin Hong, “A Lot Grouping Algorithm for Continuous Slab Caster in an Integrated Steel Mill”, Production Planning and Control, Vol.11, pp.363-368, Taylor & Francis Ltd. (2000). 
  • Myong-Rae Chang and Soo Y. Chang, “A heuristic method for self-healing ring design in a single-homing cluster”, Telecommunications Systems, Vol.14, pp.175-195, Baltzer Science Publishers (2000). 
  • Soo Y. Chang, Y Hong, Joong H. Kim and Xere Kim, “A heuristic algorithm for minimizing maintenance workforce level”, Production Planning and Control, Vol.10, pp.778-786, Taylor & Francis Ltd. (1999). 
  • Soo Y. Chang and Hark-Chin Hwang, “The Worst-case analysis of the MULTIFIT algorithm for scheduling nonsimultaneous parallel machines”, Discrete Applied Mathematics, Vol.92, pp.135-147, Elsevier Science B.V. (1999). 
  • Chi-Hyuck Jun and Soo Y. Chang, Yushin Hong, Heejoong Yang, “A Bayesian approach to prediction of system failure rates by criticalities under event trees”, International Journal of Production Economics, Vol.60-61, pp.623-628, Elsevier Science B.V. (1999). 
  • H.-C. Hwang and S. Y. Chang, “Parallel machines scheduling with machine shutdowns”, Computers and Mathematics with Application, Vol.36, pp.21-31, Pergamon (1998). 
  • J. Ha, S. Choi, S. Shin, K. Chwa, and S. Chang , “On deciding 3D part disassemblability and surface machinability”, IIE Transactions, Vol.28, pp.847-854, Kluwer Academic Publishers (1996). 
  • D. Seong, S. Y. Chang and Y. Hong, “Heuristic Algorithms for Buffer Allocation in A Production Line with Unreliable Machines”, Int’l Journal of Production Research, Vol.33, 7, pp.1989-2005 (1995). 
  • Eui S Jung, Sungjoon Park and Soo Y. Chang, “A CSP Technique-Based Interactive Control Panel Layout”, Ergonomics, Vol.38(9), pp.1884-1893 (1995). 
  • Soo Y. Chang and Katta G. Murty, “The Steepest Descent Gravitational Method For Linear Programming”, Discrete Applied Mathematics, Vol.25, pp.211-239, North-Holland (1989). 
  • Sung-Jin Chung, Katta G. Murty and Soo Y. Chang, “On K-triangle”, Discrete Applied Mathematics, Vol.15, pp.199-211, North-Holland (1986). 

Domestic Journal Articles

  • 임경국, “Parallel machines scheduling with GoS eligibility constraints : A survey”, 대한산업공학회지, Vol. 36, pp.248-254 (2010). 
  • 박종호장수영, 임경국, “작업이 일반적인 자격을 갖는 상황에서 3대의 기계와 4대의 기계의 온라인 스케줄링 문제에 대한 소고”, 대한산업공학회지, Vol.35, pp.213-217 (2009). 
  • 박종호장수영, 임경국, 강구양, “박판 여재 슬라브 재고에 대한 최적 충당 모형”, 한국경영공학회지, Vol.14, pp.155-168 (2009).
  • 박종호한윤택, ” 제철산업 열간압연공정의 일정계획 문제”, 한국경영공학회지, Vol.14, pp.69-76 (2009). 
  • 박종호임경국, 이정원, “철강 코일제품 수송 팔레트의 설계 최적화”, 대한산업공학회지, Vol.34, pp.470-480 (2008). 
  • 박종호임경국, 최봉하, “The heuristic approach to the order consolidation problem”, 대한산업공학회지, Vol.34, pp.408-413 (2008). 
  • 박종호임경국, 김기성, “Data Network을 통한 다수 클아이언트를 서비스하는 방법”, 한국경영공학회지, Vol.13, pp.73-84 (2008). 
  • 정기효, 장준호, 이원섭, 한윤택, 유희천, 장수영, 전치혁, “혁신제품개발 교육과정 개발을 위한 전략수립 방법”, 공학교육연구, 11(3), pp.5-11 (2008).
  • 장수영, 홍유신, 김중희, 김세래, “정비작업 인력 수준 최소화를 위한 발견적 기법”, 대한산업공학회지, Vol.25, pp.47-55 (1999). 
  • 박형우, 홍유신, 장수영, 황삼성, “철강 Mini Mill 에서의 효율적인 작업 단위 편성”, 대한산업공학회지, Vol.24, pp.649-660 (1998). 
  • 이유근, 백선덕, 배성문, 전치혁, 장수영, 최인준, “단일 기계 일정계획을 위한 제약조건 표현언어 및 코드 자동 생성기”, 대한산업공학회지, Vol.22, pp.209-229 (1996). 
  • 성덕현, 장수영, 홍유신, “자원제약조건을 갖는 연속흐름라인에서의 Buffer 할당에 관한 연구”, 대한산업공학회지, Vol.21, pp.541-553 (1995). 
  • 박성준, 정의승, 장수영, “제약만족 알고리즘을 이용한 상호대화적 조종패널 배치”, 대한산업공학회지, Vol.20, pp.85-97 (1994). 
  • 전치혁, 양희중, 장수영, 정의승, 임혜란, “베이지안기법에 의한 임무 신뢰도 예측”, 대한산업공학회지, Vol.18, pp.71-78 (1993). 
  • 전치혁, 이승만, 박철순, 강상엽, 장수영, 최인준, 강전태, “냉연 공정에서의 작업단위 편성”, 산업공학 Interface, Vol.6, pp.117-131 (1993). 
  • 최혁준, 장수영, “선형계획을 위한 쌍대 신경망”, 한국경영과학회지, Vol.17, pp.3-16 (1992). 
  • 장수영, “비선형계획법을 이용한 대규모 선형계획해법의 개발”, 대한산업공학회지, Vol.17, pp.131-142 (1991). 

International Conference Papers

  • Byung-In Kim, Soo Y. Chang, “Raw-material unloading at a steelworks”, ICOVACS 2009, University of Louisville , Louisville, (2009. 10. 20). (GE Best Paper Award)
  • Yunetech HanSoo Y. Chang, Byung-In Kim, Kyung-Kuk LimWoolahm Kwak, “The Raw Material Unloading Problem of a Steelworks: Combinatorial Nature”, INFORMS 2007, INFORMS, SEATTLE (2007.11.04)
  • Juneho ChangSoo Y. Chang, Byung-In Kim, Jeongin Koo, Jaejoon Shin, Sangwon Jeoung, “The Raw Material Unloading Problem of a Steelworks: a Solution Approach”, INFORMS 2007, INFORMS, SEATTLE (2007.11.05)
  • Yune T. HanSoo Y. Chang, Diego Klabjan, Jongho Park, “Transportation Problems Involving Trailers and Tractors”, INFORMS 2006, INFORMS, PITTSBURGH (2006.11.05).
  • June-Ho ChangSoo Y. Chang, “Combinatorial Problems Related to Order Consolidation”, INFORMS 2006, INFORMS, PITTSBURGH (2006.11.05).
  • Diego Klabjan, Patrick Bless, Soo Chang, “Exact and Heuristic Approaches to the Component Set Identification Problem”,INFORMS 2004 Denver Proceedings, INFORMS (2004.10.24 – 2004.10.27).
  • In-Jun Jeong, Soo Y. Chang. Kwang-Jae Kim, “Assessing the Relative Weights of Bias and Variance in Dual Response Surface Problem”,INFORMS Proceedings, INFORMS (2003.10.18 – 2003.10.22).
  • Hark-Chin Hwang, Kangbok LeeSoo Y. Chang, “Parallel Machine Scheduling with General Machine Shutdowns”, Proceedings of APIEMS,Taipei, Taiwan (2002.11.18).
  • Soo Y. Chang, D Kang, J LeeJ Park, “Steel Product Out-bound Logistics”,INFORMS, San Jose, California, USA (2002.11.17 – 2002.11.20).
  • Hark-Chin Hwang, Soo Y. Chang, Yushin Hong, “On-Line Parallel Machine Scheduling under Machine Eligibility Constraints: Posterior Competitiveness”,Proceedings of IJIE,IJIE, Busan, Korea (2002.10.24).
  • Soo Y. ChangKang-bok Lee, Tae-gyoon Joh, “Packing Problems for Scheduling Steel Manufacturing Processes”, INFORMS-KORMS,Seoul Korea (2000.01.01 – ).
  • Soo Y. ChangKangbok Lee, Taegyun Cho, “The use of interval graphs for the steel-mill scheduling problems”,INFORMS,Salt Lake City, USA (2000.01.01 – ).
  • Soo Y. ChangKangbok Lee, Taegyun Cho, “A Vector Sequencing Approach for the Steel Manufacturing Process Scheduling” ,INFORMS (1999.01.01 – ).
  • H. Park, Y. Hong, S. Y. Chang and S. Hwang, “An Efficient Scheduling Algorithm for Steel Making in Mini Mill”, 14th International Conference on Production Research, Vol.1, pp.454-457, Osaka, Japan (1997.08.04).
  • Jun, Chi-Hyuck, Soo Y. Chang, Yushin Hong and Heejoong Yang, “A Bayesian Approach to Prediction of System Failure Rates by Criticalities under Event Trees”, 14th International Conference on Production Research, Vol.1, pp.710-713, Osaka, Japan (1997.08.04).
  • Choi, Woo-Yong, Soo Y. Chang and Chi-Hyuck Jun, “Determination of Feasible Region Existency in Convex Nonlinear Programming”, Proceedings of 20th Int’l Conference on Computers & Industrial Engineering, pp.469-472, Kyongju, Korea (1996.10.06).
  • Soo Y. Chang, and Hark-Chin Hwang, “Deterministic Multiple Machine Scheduling under Machine Elligibility Constraints”, International Conference on Management Science and Economic Development of China, Vol.1, pp.63-71, Hong Kong Univ. of Science and Tech. (1996.07.16).
  • Soo Y. ChangHark-Chin Hwang, and Katta Murty, “Combinatorial Optimization in Modern Manufacturing”, International Conference on Management Science and Economic Development of China, Vol.1, pp.104-114, Hong Kong Univ. of Science and Tech. (1996.07.16).
  • C. -H. Jun, S. Y. Chang, Y. Hong and H. Yang, “Bayesian Reliability Prediction Under Event Trees”, Proc. of the 2nd SSAT Int’l Conf. on Reliability & Quality in Design, pp.113-117, Orlando (1995.03).
  • In Jun Choi, C.H. Jun, S.Y. Chang, S.Y. Kang, S.M. Bae, “A Decision Support System for Optical Fiber Telecommunication Network Design”, Proc. of 3rd Conference of Association of Asian-Pacific OR Societies, Fukuoka, Japan (1994.07).
  • S. Y. Chang, I. J. Choi, “A Job Sequencing System for Cold Coil Production Process”, TIMS/ORSA, pp.109, Boston, USA (1994).
  • S. Y. Chang, Y. Hong and C. -H. Jun, “Constraint Satisfaction Approach to Scheduling DHCR Process”, Int’l Conf. on Computerized Production Control in Steel Plant, pp.464-470, Seoul (1993.11).
  • Y. Hong, D. Jeon and S. Y. Chang, “The Analysis of a Continuous Production Line with Unreliable Machines”, Int’l Symp. on Intelligent Process Automation, , pp.263-283, Taejon (1992.01).

Domestic Conference Papers

  • 임경국장수영, ” 작업이 GoS 자격을 가지는 상황에서의 스케줄링 문제의 최신 동향”, 2010 대한산업공학회 추계학술대회, 동국대학교, 서울 (2010.11).
  • 박종호곽우람장수영, “네트워크 스위치디자인에서 나타나는 그래프의 이론적 특성”, 2009 한국경영과학회/대한산업공학회 춘계공동학술대회, 부산대학교, 부산 (2009.05).
  • 장수영 “공학의 대상으로서의 서비스”, 2009 한국경영과학회/대한산업공학회 춘계공동학술대회, 부산대학교, 부산 (2009.05).
  • 임경국박종호장수영, “The Analysis of Algorithm for Four Machines Scheduling with General Eligibility”, 대한산업공학회 2008 추계학술대회, 한양대학교, 서울 (2008.11).
  • 장준호곽우람장수영, “구간그래프에서 주문통합 최대 선택 문제의 복잡도 규명”, 대한산업공학회 2008 추계학술대회, 한양대학교, 서울 (2008.11).
  • 임경국박종호장수영, “The Analysis of Algorithm for Three Machines Scheduling with General Eligibility”, 한국경영과학회 2007 추계학술대회, 한양대학교, 서울 (2007.11).
  • 전혜민곽우람장수영, “산업공학의 서비스 과학에의 기여를 위한 서비스 정의”, 한국경영과학회 2007 추계학술대회, 한양대학교, 서울 (2007.11).
  • 김병인, 장수영장준호한윤택, 구정인, 임경국, 신재준, 정상원, 곽우람, “A raw-material unloading scheduling system for an integrated steel mill”, 한국경영과학회 2007 추계학술대회, 한양대학교, 서울 (2007.11).
  • 민윤홍, 홍성필, 권순우, 최병천, 장수영, “Maximum batch cover for order consolidation”, 한국경영과학회 2007 추계학술대회, 한양대학교, 서울 (2007.11).
  • 최봉하장준호장수영, “주문 통합 문제에 대한 발견적 기법”, 대한산업공학회 2007 추계학술대회, 건국대학교, 서울 (2007.11).
  • 박종호임경국장수영, “Scheduling of Three Identical Machines under General Eligibility”, 대한산업공학회 2007 추계학술대회, 건국대학교, 서울 (2007.11).
  • 한윤택박종호장수영, “제철산업 열간압연공정 일정계획을 위해 정의된 경로분할 문제”, 대한산업공학회 2007 추계학술대회, 건국대학교, 서울 (2007.11).
  • 장준호, 이원섭, 정기효, 장준호, 장수영, 유희천, 전치혁, “혁신제품개발 모듈 교육과정 개발을 위한 전략적 접근 및 적용”, 대한산업공학회 2006 추계학술대회, 고려대학교, 서울 (2006.11).
  • 장준호장수영, “단위작업 편성 문제의 Worst Case 분석”, 한국경영과학회 2006 추계 경영과학회, 서울대학교, 서울 (2006.11).
  • 한윤택장수영, “트레일러-트렉터문제에 대한 연구”, 한국경영과학회 2006 추계 경영과학회, 서울대학교, 서울 (2006.11).
  • 장수영, 김병인, “일관제철소 원료 부두 하역 일정계획 최적화 모형”, 한국경영과학회 2006 추계 경영과학회, 서울대학교, 서울 (2006.11).
  • 이원섭, 장준호, 장준호, 유시원, 유희천, 장수영, 전치혁, “혁신제품개발 모듈 교육과정 구축을 위한 stakeholder의 요구사항 파악”, 대한산업공학회/한국경영과학회 2006 춘계공동학술대회, KAIST, 대전 (2006.05).
  • 문정태, 정기효, 한윤택, 유희천, 장수영, 전치혁, 정무영, “국내외 대학의 제품 설계 및 개발 교육 과정 벤치마킹”, 대학산업공학회/한국경영과학회 2006 춘계공동학술대회, KAIST, 대전 (2006.05).
  • 박상혁장수영, ” 후판 날판설계를 위한 이차원 빈패킹 최적화 기법”, 대한산업공학회/한국경영과학회 2006 춘계공동학술대회, KAIST, 대전 (2006.5).
  • 장준호장수영, “효율적 주문집약을 위한 단위작업 편성”, 대한산업공학회/한국경영과학회 2006 춘계공동학술대회, KAIST, 대전 (2006.5).
  • 한윤택장수영, “트레일러와 트렉터를 사용하는 운송문제 분석”, 대한산업공학회/한국경영과학회 2006 춘계공동학술대회, KAIST, 대전 (2006.5).
  • 정인준, 김광재, 장수영, “쌍대반응표면 최적화에서 편차와 분산의 가중치 결정에 관한 연구”, 한국경영과학회 2004 춘계 학술대회, 전북대학교, 전주 (2004.05).
  • 박종혁, 홍유신, 장수영, “다품목 병렬 배취설비에서의 Dynamic Lot Sizing”, 1998 추계 대한산업공학회 논문집, pp.318-322, 대한산업공학회 (1998.10).
  • 김중희, 장수영, “Applying Bin Packing Heuristics to the Repair Manpower Assignment in Steel Industry” , 한국경영과학회 학술대회 논문집, 홍익대학교, 서울 (1997.11).
  • 전치혁, 장수영, 홍유신, 양희중, “Event Tree 를 이용한 치명도에 따른 시스템 고장률의 베이지안 분석”, 1996 대한설비관리학회 창립 학술발표대회 논문집, pp.88-93, 아주대학교, 수원 (1996.11).
  • 박형우, 한승아, 황삼성, 홍유신, 장수영, “철강 Mini Mill 에서의 생산 일정계획 시스템”, 대한산업공학회 ’96 추계학술대회 논문집, pp.27-31, 대한산업공학회 (1996.11).
  • 박성준, 조항준, 정의승, 장수영, “Constraint Satisfaction Problem 기법을 이용한 조종패널 설계방법”, 대한인간공학회 학술대회 논문집, pp.75-pp.84, 동아대학교 (1996.04).
  • 신동민, 박형우, 홍유신, 장수영, “철강 Mini Mill 공정의 생산일정계획”, 대한산업공학회 ’95 추계학술대회 논문집 , pp.238-243, 대한산업공학회 (1995.10).
  • 이유근, 이승만, 전치혁, 최인준, 장수영, “연속소둔 공정의 작업단위 편성을 위한 발견적 기법”, 대한산업공학회/한국경영과학회 1994 년 춘계 공동 학술대회 논문집, pp.280~287, 창원 (1994.04).
  • 박성준, 정의승, 장수영, 조항준, “An Interactive and Iterative Control Panel Layout”, 한국경영과학회/대한산업공학회 공동학술대회 논문집, 창원 (1994.04).
  • 이영엽, 도남철, 장수영, 최인준, 정무영, 박춘렬, “지식베이스를 이용한 CAD 도면에서의 BOM 자동 생성”, 1993 년 한국자동제어 학회 추계 학술대회 논문집, pp.151~155, 서울 (1993.10).
  • 최인준, 전치혁, 장수영, 이유근, 이승만, “CSP 에 근거한 일정계획 언어 개발에 관한 연구”, 대한산업공학회 1993 년 추계학술대회 논문집 , pp.550, 서울 (1993.10).
  • 정무영, 장수영, 최인준, 도남철, 이영엽, “Bar Code 시스템과 연계한 실시간 재고 / 출고 관리 시스템 개발”, 대한산업공학회 1993 년 추계학술대회 논문집 , pp.625, 서울 (1993.10).
  • 강상엽, 최인준, 전치혁, 장수영, 장명래, 배성문, “광통신망 설계 의사결정 지원 시스템 개발”, 대한산업공학회 학술대회 논문집, 서울산업대학교, (1993.10).
  • 최인준, 전치혁, 장수영, 최문수, 안영신, 강상엽, “통신망 최적설계 및 성능예측을 위한 의사결정지원 시스템”, 한국경영과학회 – 대한산업공학회 1993 춘계공동학술대회 논문집 , 대구 (1993.04).
  • 이승만, 박철순, 전치혁, 장수영, 최인준, “냉연공정에서의 작업단위 편성”, 한국경영과학회 – 대한산업공학회 1993 춘계공동학술대회 논문집 , 대구 (1993.04).
  • 전치혁, 장수영, 최인준, 강상엽, 안영신, 강상엽, “Constraint Logic Programming 의 일정계획 응용”, 한국경영과학회 1992 년 추계학술대회 논문집 , 서울 (1992.09).
  • 최우용, 장수영, 홍유신, 전치혁, “선형계획을 위한 반복기법에 관한 연구”, 한국경영과학회/대한산업공학회 공동학술대회 논문집, 울산대학교, (1992.05).
  • 장수영, 오구일, 김광수, “선형계획의 CAD/CAM 응용”, 한국경영과학회/대한산업공학회 공동학술대회 논문집, 울산대학교, (1992.05).
  • 김명수, 장수영, 홍유신, 전치혁, “Scheduling Vehicles on Track”, 한국경영과학회/대한산업공학회 공동학술대회 논문집, 울산대학교, (1992.05).
  • 김종기, 홍유신, 장수영, “일정계획 문제를 위한 Constraint Satisfaction Problem Technique 의 응용”, 대한산업공학회 ’91 추계학술대회논문집, pp.213-226, 서울 (1991.10).

Book Chapter

  • S. Y. ChangH Hwang, K. Murty, “Optimizing the Radial Component Insertion Operations on PCBs”, Industrial Applications of Combinatorial Optimization, Applied optimizations series volume 16., Edited by Gang Yu, Vol.16, pp.125-141, Kluwer Academic Publisher (1998).